Local Content

Through this page you can download templates and local content documents based on the cost of the project.

Projects with a cost between 100 to 400 Million SAR

  • Terms and conditions for projects valued between 100 and 400 Million SAR

  • Guideline for projects valued between 100 and 400 Million SAR

  • Follow-up performance form for projects is between 100-400 Million SAR

  • Form of plan for projects that costs between 100-400 million

Projects with cost exceeding 400 million SAR

  • Terms and conditions for projects with cost exceeding 400 million SAR

  • Follow-up Form for projects that costs more than 400 million SAR

  • Form of plan for projects that costs more than 400 million

Local content measurement

  • Guideline for measuring local content at the enterprise level

  • Form for measuring local content at the enterprise level